What can start now. Algorithms, state machines, protocol logic and their tests do not depend on a processor. They are written against a thin hardware abstraction and run on the host in software-in-the-loop (V-5). Only drivers, board support and timing measurements wait for D-3.
Scope. Firmware as spec 07.1 defines it — code running directly on a microcontroller — together with the Real-time Control Layer's modules (F-4 to F-10), which are firmware if decision D-3 selects a microcontroller and software under a real-time Linux kernel if it does not. They are planned here either way, because their deadlines, not their layer, decide how they are built. Capture drivers on the edge module are software and are listed in software.md.
One rule carried from the architecture. Every module that carries a deadline reports its misses. Each task below that implements a timed loop includes the deadline monitor for it; it is not a separate task that can be skipped.
F-0 — Platform
Task
To
Waits for
Hardware abstraction layer: the interface every module is written against, with a host implementation for simulation
L4
—
Board support package for the real-time processor
L4
D-3
RTOS configuration: task set, priorities, stack budgets, the scheduling analysis that shows every deadline is met on paper
L4
D-3
Deadline monitor and miss reporting, shared by every timed module
L4
—
Watchdogs: per task and per board
L4
D-3
Build system, host and target, reproducible
L4
—
Bootloader and signed update, with rollback
L4
D-7
F-1 — Sensor drivers
Task
To
Waits for
Timestamp at source for every channel
L4
F-2
IMU driver, per IMU fitted
L4
E-6
Joint encoder readout, absolute and incremental
L4
E-3
Joint torque sensing
L4
E-3
Tactile readout control — scan scheduling, event thresholds
L4
E-7 — LAB
Per-channel health: dropout, saturation, stuck value
L4
—
F-2 — Time base
Task
To
Waits for
EtherCAT distributed-clock configuration and drift compensation
L4
E-5
Bridging the EtherCAT clock to CAN FD nodes and to the Jetson
L4
E-1
Skew measurement and reporting against the permitted skew (⟦IMPL⟧)
L5
V-6
Closes C-15 in simulated form once V-6 runs it
L5
V-6
F-3 — Actuator drivers (joint drive firmware)
Runs on each joint drive board. If D-2 chooses procured modules, most of this is replaced by the module's own firmware and shrinks to integration.
Task
To
Waits for
Field-oriented current control, at the kHz-class rate (⟦IMPL⟧)
L4
D-2
Velocity and position loops, and impedance mode for compliant contact
L4
D-2
Commutation and encoder calibration
L4
D-2
Protections: overcurrent, overtemperature, overvoltage on regeneration, stall
L4
E-3
Joint lock actuation and state (spec 03.2 measure 4)
L4
M-3
EtherCAT slave application: process data, state machine
L4
E-3
Telemetry for the full-tier log: commanded and measured current, position, velocity, torque, temperature
L4
—
F-4 — State estimator
Task
To
Waits for
Floating-base state estimation from IMU, joint kinematics and contact, at 1 kHz
L4
—
Contact detection per foot and per hand
L4
—
Covariance reporting, so that a degraded estimate says it is degraded
L4
—
Verified against the physics model's ground truth
L5
V-5
F-5 — Balance controller
Task
To
Waits for
Balance at ≥ 500 Hz: centre-of-mass and ZMP regulation, whole-body torque distribution within joint limits
L4
—
Step recovery
L4
—
Motion intent interface from the edge software — intent, not commands (architecture §4)
L4
—
Priority over the reflex path where they contend (architecture §3)
L4
—
Verified in simulation — standing, pushed, stepping (V-3)
L5
V-1
Closes C-13 in simulated form when run on the emulated target (V-6)
L5
V-6
F-6 — Reflex path
Task
To
Waits for
Stage pipeline with the budget of architecture §2 — acquisition 1.0, agency tagging 0.5, state assembly 2.0, reflex decision 1.0, command 4.0, log 0.05 ms
L4
—
Per-stage timing instrumentation, so the split can be measured and moved
L4
—
Loadable reflex set: format, signing, loading at runtime
L4
D-7
Reflex decision: lookup against the loaded reflex set
L4
—
Anchored context written for every reflex (spec 07.4 guarantee 3)
L4
F-10
Closes C-14 in simulated form when measured end to end on V-6
L5
V-6
F-7 — Agency tagging
Task
To
Waits for
Port the efference-copy gate of reference/agency.py to firmware, where commanded and measured values meet
L4
—
Cross-check the port against the Python reference on the same recorded data
L5
—
F-8 — Safe-state supervisor
Task
To
Waits for
Fault taxonomy and the response to each
L4
—
Fall detection early enough to act on
L4
F-4
Controlled descent to a supported posture — must beat the fall
L4
F-5
Power-loss behaviour: what the supercapacitor tier holds up, and for how long
L4
E-2
Closes C-16 in simulated form (V-4)
L5
V-1
F-9 — Power state machine and BMS
Task
To
Waits for
The four state levels of spec 03.4, and every transition with its wake latency
L4
—
Tiered sleep with the always-on wake-up circuit on the always-on rail
L4
E-4
Battery management: cell monitoring, balancing, state of charge and health, protection
L4
D-5
Pre-charge and contactor sequencing
L4
E-2
Dock detection and charge control
L4
E-2
State-dependent gating (spec 03.2 measure 1) — which actuators and channels run
L4
—
F-10 — Log writer
Task
To
Waits for
Port the record format and hash chain of reference/audit_log.py to firmware at loop rate
L4
—
Batch signing through the secure element; batch period from measured signing throughput
L4
D-7
Storage layout on the log device, and behaviour when it fills — never trimmed during a link outage (architecture §5)
L4
E-5
Byte-for-byte verification against the Python verifier
L5
—
F-11 — Attestation agent
Task
To
Waits for
Tier 1: measured boot and per-node signatures
L4
D-7
Tier 2: physical fingerprint baselines at commissioning, and drift checks
L4
F-1
Tier 3: active challenge — commanded motion checked against encoder, IMU and vision agreement
L4
F-3, F-4
Closes C-11 in simulated form for tiers 2 and 3
L5
V-5
F-12 — Low-power beacon
Task
To
Waits for
Signed summary format at quiescent power: loop_state, loop_state_age, body_state, log_root, alive (spec 06.5)
L4
—
Hold the loop's latest loop_state in always-on memory so it survives into sleep, carried byte for byte
L4
E-4
Duty cycle against the quiescent-power budget of spec 03.6
L4
D-7
Radio driver
L4
E-8
F-13 — Shell controllers
Task
To
Waits for
Variable-stiffness field control, millisecond class
L4
E-10 — LAB
Electrochromic colour control, second class
L4
E-10 — LAB
F-14 — Link firmware
Task
To
Waits for
mmWave radio bring-up and beam tracking interface
L4
E-8
Fallback link handover
L4
E-8
OBC: stand-by while the IPC is online, the two triggers (heartbeat missed, Main Controller hands over), and command given back only when the Main Controller takes it; in command, maintain, preserve, continue, attempt; never decide (spec 07.5)
L4
—
F-15 — Expressive actuators
Task
To
Waits for
Facial action-unit control: per-unit position and speed within the ranges of ID-6, and blending of simultaneous units
L4
ID-6 — LAB
Eye and pupil actuation, coordinated with neck gaze
L4
ID-6
Expression requests arrive as intent from the edge software, like motion (architecture §4); the real-time code bounds range and rate, it does not choose